Two (2) castings per day are achieved using Self-Compacting Concrete grade C30-C35 (4-5,000psi)

No, each battery-mould can produce many different sections of your structure all at the same time, so that your building team can be erecting and completing complete structures simultaneously.

4 to 5 structures/day or 700-750 VERTICAL m2 depending on the Architectural design and client’s specific requirements.

An average of 800 units/structures per annum

7 to 10 business days after all the information is supplied.

Our Formwork surface finish is classified as CLASS F3.